• Site At-a-Glance

Cox Road Landfill Site

2012

PNL's Role

PNL has functioned as the general environmental contractor from the project inception in 2004 to closure of the site in 2011. PNL staff performed the site investigation work, data analysis, and submission of property assessment reports to the Texas Commission on Environmental Quality (TCEQ). PNL also devised the Response Action Plan (RAP) for the site which included a site wide soil cover and reduced groundwater monitoring program. PNL coordinated selection of remedial contractors for the start of construction in early 2011. PNL as part of the remedy implementation secured options on nearby sources of borrow soil for the cover early in the project which was key reducing haul distances and implementing the remedy at a predictable cost. The project was completed on time within the range of forecasted costs evaluated using statistical forecast methods. As of early 2012, the vegetative cover on the newly installed cap has taken hold and PNL is preparing the final construction completion documents for submission to TCEQ.

Health and Safety Metrics

  • OSHA Recordables: 0
  • Lost Time/Lost Work Day Incidents: 0

Technical Milestones

  • Extensive borehole and soil sample investigation
  • 50 hole CPT and proof-roll geotechnical assessment
  • Cap and cover 80 acre landfill with 2' cover
  • Geosynthetic fabric placement on 40 acres below soil cover for increased cover stability
  • Groundwater monitoring reduced from 30 to 7 wells
  • Site in O&M

Stakeholder Relations

  • Initial strong public interest that diminshed through time as remedy completed
  • Public information website established with periodic updates
  • Close coordination with County officials